What the AI buildout costs and needs
What it shows
A utility meter cabinet with a thick supply pipe, a side cooling coil and a row of gauges; the green gauge stands for what the buildout draws and costs.
The case
The image of the case What the AI buildout costs and needs, drawn once for it.
An illustration is never a picture of what happened. Drawn on 13 Oct 2026.